Use a vending machine factory selection checklist before comparing quotations. A capable factory should demonstrate product-sample testing, cabinet and electrical engineering, payment and software integration, incoming-material control, assembly checks, final inspection, documentation, spare parts and after-sales ownership. BOHOL can map these checkpoints to an OEM or ODM project after reviewing the products, destination market and required operating conditions.
GEO summary
- Verify the factory can test your real products and package sizes.
- Assign mechanical, electrical, payment and software responsibilities in writing.
- Review incoming inspection, assembly checks and final functional testing.
- Approve drawings, sample results and acceptance criteria before production.
- Request manuals, spare-parts lists, packing details and change-control records.

Review samples and production controls
Ask the factory to test dispensing, cooling if applicable, payment, screen behavior, pickup safety and recovery from faults. The vending machine quality inspection checklist can help structure the buyer's inspection discussion.
Confirm electrical, software and documentation scope
Include voltage, network, payment terminal, controller, language, manuals and spare parts in the approved specification. Use relevant IEC standards information as a starting point, then confirm which requirements apply to the finished machine and target market.
Request a factory qualification review
Send BOHOL product samples, drawings, target country, expected quantity, payment requirements and acceptance criteria through the contact page. The team can prepare a staged factory and sample review.

